What to Expect When Your Roof Needs Replacing

A full roof replacement is one of the larger home improvement jobs you can undertake, but it does not need to be stressful. Understanding each stage of the process helps you plan around the work, ask the right questions, and avoid being caught off guard by something unexpected. Here is a straightforward account of how a roof replacement actually unfolds, from the first call to the final tidy-up.

Ely's fenland climate brings its own demands. Cold, damp winters and the wind that sweeps across the flat Cambridgeshire landscape put roof coverings under steady pressure. Many of the older terraced and semi-detached properties in the city have original clay or concrete plain tiles that have served well for decades but eventually reach the end of their working life.

Step 1: Survey and Specification

Before any work is priced, a roofer needs to get up on the roof or into the loft to understand exactly what they are dealing with. A proper survey checks the condition of the rafters, sarking felt, ridge, hips, valleys, and any lead flashings around chimneys or dormers. It is not just about the tiles you can see from the ground.

The survey shapes the specification. For instance, a Victorian terrace in the Lynn Road area may need new ridge tiles bedded in mortar, while a 1970s detached house might suit a dry-fix ridge system that performs better long-term and requires less maintenance. Our team will explain clearly what material we recommend and why, rather than defaulting to whatever is cheapest to source.

If your property is listed or sits within a conservation area, as several buildings in central Ely do, you may need to match existing materials. Check permitted development rights before you commit to a specification - the Planning Portal is a useful starting point for understanding when approval is required.

Step 2: Stripping the Old Roof

Once the specification is agreed and dates are confirmed, the physical work begins with stripping off the old covering. Tiles, slates, or felt are removed carefully and lowered to ground level - not thrown down, which can damage gutters and cause unnecessary mess. Roof replacements at this stage often reveal issues that were invisible from outside, such as rotten fascia boards, damaged rafters, or failed felt that has been letting condensation into the loft for years.

Any structural timber that has deteriorated is replaced before the new covering goes on. Trying to lay new tiles over a weakened structure simply stores up trouble. Skipping this step is a false economy.

Step 3: Battening and Felt

With the deck in sound condition, new breathable roofing membrane is laid across the rafters, overlapping each course correctly so water cannot track back under it. Timber battens are then fixed to the precise gauge required by the chosen tile or slate, measured carefully to ensure uniform coursing from eaves to ridge.

Getting the batten gauge right matters more than most homeowners realise. An error of a few millimetres repeated across fifty courses throws the whole roof out at the ridge. Our team sets this out methodically before a single tile goes on.

Step 4: Tiling, Leadwork, and Ridge

Tiles or slates are fixed from the bottom course upward, with each course lapped over the one below. Hips and valleys need particular attention because these are the most common points where roofs leak if cut or dressed poorly. Any lead flashings around chimney stacks, skylights, or soil pipes are carefully formed and dressed at this stage - see our lead work service for more detail on what that involves.

The ridge is the last structural element to be completed. A dry-fix mechanical ridge system is increasingly common because it does not rely on mortar that can crack and blow off in frost. In an exposed location like Littleport or Soham, where wind is a constant factor, a dry-fix ridge is well worth the modest additional cost.

Once the main covering is complete, new fascias, soffits, and guttering are fitted where needed. Guttering is checked for correct fall and all downpipes are reconnected and tested.

Step 5: Final Inspection and Clearance

A thorough inspection from both the roof and ground level checks that every tile is correctly seated, every flashing is sound, and the ridge line is straight. Scaffolding is then struck and all waste material is removed from site - tiles, felt, and timber are disposed of responsibly, with heavy materials going to a licensed facility.

You should expect your property to be left clean and tidy, with gutters clear and access paths swept. The National Federation of Roofing Contractors publishes a code of practice that sets out what good workmanship and site conduct looks like, which is useful reading before you appoint any roofer.

If you are ready to get your roof assessed, contact us for a free local survey and quote. We work across Ely and the surrounding villages, including Haddenham, Chatteris, and Newmarket, and we can usually arrange a survey within a few days of your call.

Need a hand in Ely?

Get a free, no-obligation quote from a local Roofing specialist.

Call 01353 880828

More advice

7 September 2026

Common Roof Problems After a Storm

Ely's exposed Fenland location makes roofs here particularly vulnerable to storm damage. Find out which problems to look for and what to do about them.

Read more
31 August 2026

7 Warning Signs Your Roof Needs Attention

From missing tiles to ceiling stains, these 7 warning signs tell you your roof needs attention before a small problem becomes a costly repair. Ely homeowners, here is what to look for.

Read more
31 August 2026

Choosing a Roofer Who Covers Ely and Nearby Areas

Choosing the right roofer in Ely and the surrounding Fenland villages takes more than a quick online search. Here is what to look for, what to avoid and how local knowledge makes a real difference to the quality of the work.

Read more